Tuesday May 28, 3 PM EDT Cleaning crews are at the datacentre, to pump the water and install dryers. Once the floors are dry, we need to inspect all electrical boxes to ensure safety. We do not expect to have a fully functional datacentre before Thursday, although we hope to be able to turn on the storage and login nodes sometime tomorrow, if circumstances permit. Apologies, and thank you for your patience.
Tuesday May 14, 6:45 PM EDT: All systems are recovered now. Tuesday May 14, 5 PM EDT: Power loss at the datacentre resulted in loss of cooling. Systems are being restored. Friday May 3, 10 PM EDT - Saturday May 4, 2 AM EDT: The external network will be unavailable for maintenance. Running and queued jobs on the systems will not be affected.
|