Difference between revisions of "Main Page"

From SciNet Users Documentation
Jump to: navigation, search
m
(System Status)
 
(376 intermediate revisions by 10 users not shown)
Line 6: Line 6:
  
 
<!-- Use "Up" or "Down"; these are templates. -->
 
<!-- Use "Up" or "Down"; these are templates. -->
 
+
{|style="width:100%"  
{|style="width:65%"  
 
 
|{{Up|Niagara|Niagara_Quickstart}}
 
|{{Up|Niagara|Niagara_Quickstart}}
 
|{{Up|HPSS|HPSS}}
 
|{{Up|HPSS|HPSS}}
|{{Up|BGQ|BGQ}}
+
|{{Up|Mist|Mist}}
|{{Up|SGC|SOSCIP_GPU}}
 
|-
 
|{{Up|P7|P7}}
 
|{{Up|P8|P8}}
 
 
|{{Up|Teach|Teach}}
 
|{{Up|Teach|Teach}}
|{{Up|Jupyter|Jupyter_Hub}}
 
 
|-
 
|-
 +
|{{Up|Jupyter Hub|Jupyter_Hub}}
 
|{{Up|Scheduler|Niagara_Quickstart#Submitting_jobs}}
 
|{{Up|Scheduler|Niagara_Quickstart#Submitting_jobs}}
|{{Up|SSH Access|Niagara_Quickstart#Logging_in}}
+
|{{Up|File system|Niagara_Quickstart#Storage_and_quotas}}
|colspan=2|{{Up|File system|Niagara_Quickstart#Storage_and_quotas}}  
+
|{{Up|Burst Buffer|Burst_Buffer}}
 +
|-
 +
|{{Up|Login Nodes|Niagara_Quickstart#Logging_in}}  
 +
|{{Up|External Network|Niagara_Quickstart#Logging_in}}
 +
|{{Up|Globus|Globus}}
 
|}
 
|}
  
<div>
+
<!-- Current Messages: -->
Current Messages:
+
 
 +
From Tue Mar 30 at 12 noon EST to Thu Apr 1 at 12 noon EST, there will be a two-day reservation for the "Niagara at Scale" pilot  event.  During these 48 hours, only "Niagara at Scale" projects will run on the compute notes (as well as SOSCIP projects, on a subset of nodes).  All other users can still login, access their data, and submit jobs throughout this event, but the jobs will not run until after the event.  The debugjob queue will remain available to  everyone as well.
  
<font color=red>Downtime Announcement for January 15 and 16, 2019</font><br>
+
The scheduler will not start batch jobs that cannot finish before the start of this event. Users can submit small and short jobs can take advantage of this, as the scheduler may be able to fit these jobs in before the event starts on the otherwise idle nodes.
The SciNet datacentre will need to undergo a two-day maintenance shutdown in order to perform electrical work, repairs and maintenance.  The electrical work is in preparation for the upcoming installation of an emergency power generator and a larger UPS, which will result in increased resilience to power glitches and outages. The shutdown is scheduled to start on <b>Tuesday January 15, 2019, at 7 am</b> and will last until <b>Wednesday 16, 2019</b>, some time in the evening. There will be no access to any of the SciNet systems (Niagara, P7, P8, BGQ, SGC, HPSS, Teach cluster, or the filesystems) during this time.
 
Check back here for up-to-date information on the status of the systems.
 
  
 +
Tue 23 Mar 2021 12:19:07 PM EDT - Planned external network maintenance 12pm-1pm Tuesday, March 23rd.
  
 
<!--  When removing system status entries, please archive them to: https://docs.scinet.utoronto.ca/index.php/Previous_messages -->
 
<!--  When removing system status entries, please archive them to: https://docs.scinet.utoronto.ca/index.php/Previous_messages -->
</div>
+
{|style="border-spacing: 10px;width: 100%"
|}
 
 
 
{|style="border-spacing: 10px;width: 95%"
 
 
|valign="top" style="margin: 1em; padding:1em; padding-top:.1em; border:2px solid #000; background-color:#fff; border-radius:7px; width: 49.5%" |
 
|valign="top" style="margin: 1em; padding:1em; padding-top:.1em; border:2px solid #000; background-color:#fff; border-radius:7px; width: 49.5%" |
  
 
== QuickStart Guides ==
 
== QuickStart Guides ==
* [[Niagara_Quickstart|Niagara Quickstart]]
+
* [[Niagara Quickstart]]
 
* [[HPSS | HPSS archival storage]]
 
* [[HPSS | HPSS archival storage]]
* [[BGQ | SOSCIP BlueGene/Q cluster]]
+
* [[Mist| Mist Power 9 GPU cluster]]
* [[SOSCIP_GPU | SOSCIP GPU cluster]]
 
* [[P7|Experimental Power 7 cluster]]
 
* [[P8|Experimental Power 8 GPU cluster]]
 
 
* [[Teach|Teach cluster]]
 
* [[Teach|Teach cluster]]
 
* [[FAQ | FAQ (frequently asked questions)]]
 
* [[FAQ | FAQ (frequently asked questions)]]
* [[Acknowledging_SciNet | Acknowledging SciNet]]
+
* [[Acknowledging SciNet]]
 
| valign="top" style="margin: 1em; padding:1em; padding-top:.1em; border:2px solid #000; background-color:#fff; border-radius:7px; width: 49.5%" |
 
| valign="top" style="margin: 1em; padding:1em; padding-top:.1em; border:2px solid #000; background-color:#fff; border-radius:7px; width: 49.5%" |
  
 
== Tutorials, Manuals, etc. ==
 
== Tutorials, Manuals, etc. ==
* [https://courses.scinet.utoronto.ca SciNet education material]
+
* [https://support.scinet.utoronto.ca/education/browse.php SciNet education material]
 
* [https://www.youtube.com/c/SciNetHPCattheUniversityofToronto SciNet's YouTube channel]
 
* [https://www.youtube.com/c/SciNetHPCattheUniversityofToronto SciNet's YouTube channel]
 
* [[Modules specific to Niagara|Software Modules specific to Niagara]]  
 
* [[Modules specific to Niagara|Software Modules specific to Niagara]]  
Line 57: Line 50:
 
* [[Burst Buffer]]
 
* [[Burst Buffer]]
 
* [[SSH Tunneling]]
 
* [[SSH Tunneling]]
 +
* [[SSH#Two-Factor_authentication|Two-Factor Authentication]]
 
* [[Visualization]]
 
* [[Visualization]]
 
* [[Running Serial Jobs on Niagara]]
 
* [[Running Serial Jobs on Niagara]]
 
* [[Jupyter Hub]]
 
* [[Jupyter Hub]]
 
|}
 
|}

Latest revision as of 17:32, 1 April 2021

System Status

Niagara HPSS Mist Teach
Jupyter Hub Scheduler File system Burst Buffer
Login Nodes External Network Globus


From Tue Mar 30 at 12 noon EST to Thu Apr 1 at 12 noon EST, there will be a two-day reservation for the "Niagara at Scale" pilot event. During these 48 hours, only "Niagara at Scale" projects will run on the compute notes (as well as SOSCIP projects, on a subset of nodes). All other users can still login, access their data, and submit jobs throughout this event, but the jobs will not run until after the event. The debugjob queue will remain available to everyone as well.

The scheduler will not start batch jobs that cannot finish before the start of this event. Users can submit small and short jobs can take advantage of this, as the scheduler may be able to fit these jobs in before the event starts on the otherwise idle nodes.

Tue 23 Mar 2021 12:19:07 PM EDT - Planned external network maintenance 12pm-1pm Tuesday, March 23rd.

QuickStart Guides

Tutorials, Manuals, etc.