Difference between revisions of "Main Page"
From SciNet Users Documentation
m |
m (→QuickStart Guides) |
||
Line 42: | Line 42: | ||
* [[P7|Experimental Power 7 cluster]] | * [[P7|Experimental Power 7 cluster]] | ||
* [[P8|Experimental Power 8 GPU cluster]] | * [[P8|Experimental Power 8 GPU cluster]] | ||
+ | * [[Teach|Teach cluster]] | ||
* [[FAQ | FAQ (frequently asked questions)]] | * [[FAQ | FAQ (frequently asked questions)]] | ||
* [[Acknowledging_SciNet | Acknowledging SciNet]] | * [[Acknowledging_SciNet | Acknowledging SciNet]] |
Revision as of 00:45, 4 December 2018
System Status
Current Messages:
The SciNet datacentre will need to undergo a maintenance shutdown in order to perform electrical work and repairs. This is in preparation for the upcoming installation of an emergency power generator and a larger UPS, which will result in increased resilience to power glitches and outages. The shutdown is scheduled for Tuesday December 18th 2018, from 7 am to 7 pm and there will be no access to any of the SciNet systems (Niagara, P7, P8, BGQ, SGC, HPSS, Teach cluster, or the filesystems) during this time.
|
QuickStart Guides |
Tutorials, Manuals, etc. |